Active Point (Required)
- Last UpdatedOct 04, 2024
- 1 minute read
- PI System
- PI Server 2018
- PI Server
You must specify an Active Point to start generating PIUnitBatches. An Active Point is the PI point that determines the start and end of a PIUnitBatch. Use a PI point of type integer, digital, or string. If this attribute is not specified or the PI point does not exist, the PIUnitBatches, and therefore the PIBatches and PISubBatches, are not generated.