Link or unlink a PIUnitBatch to a PIBatch
- Last UpdatedOct 04, 2024
- 1 minute read
- PI System
- PI Server 2018
- PI Server
You can link a PIUnitBatch to exactly one PIBatch; that PIUnitBatch becomes a child of the PIBatch. Unlike a PISubBatch, a PIUnitBatch can exist independently; therefore linking a PIUnitBatch to a PIBatch is optional.
-
In the search results list, click a PIUnitBatch to view details about that PIUnitBatch on the right side of the Batch Database tool.
The PIBatch field shows the PIBatch linked to the selected PIUnitBatch.
-
Use the buttons to the right of the PIBatch field to add or remove a link:
To:
Do this:
Link to a PIBatch
-
Click the Link to a PIBatch button to the right of the PIBatch field.
-
Use the Search for PIBatches window to search for the PIBatch you want to link to.
-
Select the PIBatch that you want to link to, and click Select.
Unlink from a PIBatch
Click Remove a PIBatch Link to remove a link between the PIUnitBatch and a PIBatch. If there is no link, this button is disabled.
-