Please ensure Javascript is enabled for purposes of website accessibility
Powered by Zoomin Software. For more details please contactZoomin

AVEVA™ Unified Operations Center for Renewables

Installation checklist

  • Last UpdatedSep 05, 2024
  • 1 minute read

Complete the following steps to install UOC for Renewables:

  1. Install the Windows Desktop Experience feature.

  2. Install Microsoft SQL Server.

  3. Install and configure Standard Operating Procedure (SOP). For more information, refer to Standard Operating Procedure (SOP) Guide available in AVEVA Documentation Portal.

  4. Install and configure System Platform 2020 R2 SP1.

  5. Install and configure Work Tasks.

  6. Configure System Platform 2020 R2 SP1. This step includes several steps involving the installation and configuration of the following:

    • Simulation files

    • Workflow Management connector

    • Insight Newsfeed

      Note: Install Roboto font from https://fonts.google.com/specimen/Roboto. You can do this at any stage of the installation process.

Ensure that the hardware and software requirements are met for installing the required applications. Also, check that you have a valid license for all the applications.

TitleResults for “How to create a CRG?”Also Available in