Installation checklist
- Last UpdatedSep 05, 2024
- 1 minute read
Complete the following steps to install UOC for Renewables:
-
Install the Windows Desktop Experience feature.
-
Install Microsoft SQL Server.
-
Install and configure Standard Operating Procedure (SOP). For more information, refer to Standard Operating Procedure (SOP) Guide available in AVEVA Documentation Portal.
-
Install and configure System Platform 2020 R2 SP1.
-
Install and configure Work Tasks.
-
Configure System Platform 2020 R2 SP1. This step includes several steps involving the installation and configuration of the following:
-
Simulation files
-
Workflow Management connector
-
Insight Newsfeed
Note: Install Roboto font from https://fonts.google.com/specimen/Roboto. You can do this at any stage of the installation process.
-
Ensure that the hardware and software requirements are met for installing the required applications. Also, check that you have a valid license for all the applications.