Please ensure Javascript is enabled for purposes of website accessibility
Powered by Zoomin Software. For more details please contactZoomin

AVEVA™ Unified Operations Center for Water

Installation checklist

  • Last UpdatedJun 11, 2024
  • 1 minute read

Complete the following steps to install UOC for Water:

  1. Install the Windows Desktop Experience feature.

  2. Install Microsoft SQL Server version 2019 express edition or higher.

  3. Install and configure the following components from AVEVA System Platform 2023 R2.

    • AVEVA Application Server

    • AVEVA Historian

    • Operations Control Logger

    • AVEVA Enterprise License Manager

    • Operations Control Management Console (OCMC)

      Note: Prior to installing UOC for Water, install SP 2023 R2 and then install AVEVA System Platform 2023 R2 Hot Fix IMS3014417 available at Deliverables\InstallFiles\HotFix_IMS3014417.

For more information on how to install and configure System Platform products, refer to AVEVA System Platform Installation Guide.

Note: Install Roboto font from https://fonts.google.com/specimen/Roboto. You can do this at any stage of the installation process.

Ensure that the hardware and software requirements are met for installing the required applications. Also, verify you have a valid license for all the applications.

TitleResults for “How to create a CRG?”Also Available in