Add production to a job
- Last UpdatedJan 21, 2026
- 1 minute read
This test procedure calls the Prod.JobExec.AddProd Stateless API method to verify that a large number of parameters of different datatypes that affect multiple database tables can be passed correctly from the MES Connector and be recorded in the MES database.
The process for creating the Add Production to a Job test procedure is the same as that described in Add a job, with exceptions as noted in the following topics.
Related Links
- Create the add production workflow
- Create a Work Tasks add production form
- Bind the add production form to the add production workflow
- Add a variable for the DateTime input
- Link the add production workflow variables to add production form controls
- Publish the add production form
- Test the add production workflow