Setup
- Last UpdatedMar 26, 2026
- 2 minute read
Prerequisites
The prerequisites for the integration are:
-
The AVEVA Data Pipeline is required to process the incoming APCM data.
-
AIM-A must be added as an asset to the correct Data Pipeline account before it can process APCM data.
-
Markups and objects (which APCM needs to integrate with) should be classified in AIM-A.
CONNECT requirements
To provide AIM-A as an available integration for APCM, as seen in CONNECT, ensure that both of the solutions are available and enabled. They can be at different folder levels in CONNECT.
-
Log into CONNECT.
-
Turn the Point Cloud Manager solution on and select the 3-dots.

-
From the APCM solution menu select Manage roles.
-
Assign the Data Pipeline User role and select Save.
-
From the APCM solution menu select Manage integrations.
-
Select the appropriate PCM to AIM-A integration and select Next.

Note: For further configuration, refer to Set up PCM-AIM integration.
Whitelist APCM URL in AIM
To ensure the Data Pipeline allows access to the APCM URLs (as specified in the InfoLocator attribute) to be processed, raise a support ticket with AVEVA to add all domains (present in the APCM URLs) to the Import Server's SafeDomains list.