Replicate Changes
- Last UpdatedMay 10, 2023
- 1 minute read
To replicate changes:
-
Go to the IPE staging area, and then open the XML file you want to update.
For example, updating the file by adding a new object, or changing the value of a characteristic.
-
Using the Import Controller, load the updated XML file into the primary database.
-
Run the Replication Tool.
Note: For information about how to run the Replication Tool, see Run the Replication Tool.
-
Open the Import Controller.
-
Right-click the replication package in the secondary database, and then select Update Working.
The data is loaded from the replication package into the secondary database. The secondary database is now a duplicate of the primary database.
-
To make the changes viewable in Dashboard, you must issue the information.
Note: For details on how to issue the information, see Issue the Information.
-
Check for errors in the Import Controller.
-
Configure AIM to connect to the secondary database.
-
Launch AIM and confirm if the application is functioning.