Project Material
- Last UpdatedJan 26, 2023
- 1 minute read
Project material is raw material assigned to the project or to specific manufacturing packages in the database. The assignment of material is done within a ERM integration service, but can also be done manually using the Material Handling function on the Manage tab of the ribbon.
A general description of project material can be found in the documentation for AVEVA Marine.