Please ensure Javascript is enabled for purposes of website accessibility
Powered by Zoomin Software. For more details please contactZoomin

AVEVA™ Operational Safety Management

Setting up isolation points

  • Last UpdatedFeb 19, 2024
  • 1 minute read

Use this list as a basic guideline for setting up and using isolation points.

Add isolation points to the list. There are several ways to add isolation points. You can add Isolation points by searching for tags.

Add isolation points from tags in the schematic.

Optionally, you can plot new isolation points on the schematic drawing.

Change the Maintenance position, if needed.

Add a system lock or personal lock to an isolation point, if needed. This indicates that the physical point is locked.

Process the status of the isolation list.

Sign off on each of the isolation points in the isolation list. Each isolated point must be signed.

Reset the isolation points to their starting positions. When work is complete, the points need to be reset to original position.

If required, test the resetting of isolation points to their starting positions.

When all points have been reset and tested, close the list. Close the isolation list by processing it to Closed status.

Related Links
TitleResults for “How to create a CRG?”Also Available in