Welcome to AVEVA Pipeline Operations for Gas
- Last UpdatedSep 18, 2026
- 1 minute read
Welcome to AVEVA Pipeline Operations for Gas 2025 Patch 2, the latest release of our gas platform.
The sections within this guide describe how to work with AVEVA Pipeline Operations for Gas 2025 Patch 2 and are intended for Administrators and Controllers.
AVEVA Pipeline Operations for Gas is designed to manage and optimize the safe, efficient, and compliant operation of gas pipeline networks.
As part of the broader AVEVA Enterprise SCADA ecosystem, AVEVA Pipeline Operations for Gas is tailored for midstream oil and gas operations, and delivers the following core functionality:
-
Line-pack calculation: Determines the amount of gas stored in the pipeline at any given time.
-
Real-time flow and gas quality tracking: Monitors gas composition and flow dynamics continuously.
-
Gas contract management: Tracks expected hourly profiles, end-of-day volumes, and calculates the remaining time to meet contractual obligations.
-
Gas quality redirection: Allows substitution of invalid gas quality records with valid ones to maintain operational continuity.
-
Virtual chromatographs: Simulates gas quality readings using flow-weighted averages from upstream sources.
Note: The format and structure of the online help may differ slightly from the PDF versions provided with previous product releases. These structural changes have been made intentionally to reduce redundant content, improve user experience, and better align with the AVEVA Documentation Portal standards. The core, release-specific content remains unchanged from the originally released product versions.