Gas Contract Nominations (GCN) Summary window
- Last UpdatedApr 24, 2025
- 2 minute read
This window provides information, in a tabular format, about the system's existing contract records.

The following table describes the Gas Contract Nominations (GCN) Summary fields.
|
Field |
Description |
|---|---|
|
Contract Name |
The name of the contract record. |
|
Type |
The Point Class to which the contract record belongs. |
|
R/D |
The flow direction on the pipeline. Possible values:
|
|
Description |
A description of the gascontract record. |
|
Prior Cycle (V) |
The prior cycle's nominated volume |
|
Curr Cycle (V) |
The current cycle's nominated volume. |
|
Nom Diff (V) |
The difference between the current cycle's nominated volume and the previous cycle's nominated volume. |
|
Accum Flow (V) |
The current volume flow accumulation. |
|
Cur Flow Rate (V) |
The current volume flow rate. |
|
Est. Will-Be (V) |
The projected volume based on the following:
|
|
Flow Diff (V) |
The difference between the projected volume and the current cycle's nominated volume. |
|
Target Flow (V) |
The recommended volume flow rate to meet the nominated volume. |
|
Next Cycle (V) |
The nomination volume for the next cycle. |
|
Next Gas Day (V) |
The nomination volume for the next gas day. |
|
Prior Cycle (E) |
The prior cycle's nominated energy. |
|
Curr Cycle (E) |
The current cycle's nominated energy. |
|
Nom Diff (E) |
The difference between the current cycle's nominated energy and the previous cycle's nominated energy. |
|
Accum Flow (E) |
The current energy flow accumulation. |
|
Cur Flow Rate (E) |
The current energy flow rate. |
|
Est. Will-Be (E) |
The projected energy based on the following:
|
|
Flow Diff (E) |
The difference between the projected energy and the current cycle's nominated energy. |
|
Target Flow (E) |
The recommended energy flow rate to meet the nominated energy. |
|
Next Cycle (E) |
The nomination energy for the next cycle. |
|
Next Gas Day (E) |
The nomination energy for the next gas day. |