Standard, Minimum, and Maximum Utilization Reason Times
- Last UpdatedMar 22, 2016
- 1 minute read
When configuring a utilization reason, the Standard, Minimum, and Maximum Times can be specified for it. These times can be displayed in MES Web Portal and in utilization reports to indicate expected times that an entity can be in the utilization reason.