OEE
- Last UpdatedMay 01, 2023
- 1 minute read
When the Can Track OEE capability is selected, the OEE group becomes available in the Properties window.
The OEE (Overall Equipment Efficiency) configuration group allows you to establish targets that are to be achieved during production, and compare the actual results with the targets.

Production Data from
Specifies an entity that contains production data for calculating the overall equipment efficiency. If you select an entity, you will receive the production data for OEE calculation from that entity.
Utilization Data from
Specifies an entity that contains utilization data for calculating the overall equipment efficiency. If you select an entity, you will receive the utilization data for OEE calculation from that entity.
The OEE items are as follows:
|
OEE Items |
Target% |
Actual% |
|---|---|---|
|
OEE |
Specifies the target OEE percentage identified for an entity. |
Specifies the actual OEE percentage for a selected entity. |
|
Performance |
Specifies the target performance percentage identified for an entity. |
Specifies the actual performance percentage for a selected entity. |
|
Quality |
Specifies the target quality percentage identified for an entity. |
Specifies the actual quality percentage for a selected entity. |
Default Production Rate
Specifies the default production rate for the entity.
The estimated production rate must be greater than 0. An entry of 0 will cause an error.