Please ensure Javascript is enabled for purposes of website accessibility
Powered by Zoomin Software. For more details please contactZoomin

AVEVA™ Manufacturing Execution System

Item Production Filters

  • Last UpdatedApr 24, 2017
  • 1 minute read

Embedded Image (65% Scaling) (LIVE)

The available filters are listed below, with additional information about using the filter provided as needed.

Work Order

Operation

Seq No

Shift

Shift Start (Begin)

If a Shift Start (Begin) entry that is after the Shift Start (End) entry is entered, the Shift Start (End) entry is changed to match the Shift Start (Begin) entry.

Shift Start (End)

If a Shift Start (End) entry that is before the Shift Start (Begin) entry is entered, the Shift Start (Begin) entry is changed to match the Shift Start (End) entry.

User

Hour Start (Begin)

If also entering an Hour Start (End), make sure it occurs after or on the Hours Start (Begin) entry, as these two fields are not validated prior to the filtering.

Hour Start (End)

If also entering an Hour Start (Begin), make sure it occurs prior to or on the Hours Start (End) entry, as these two fields are not validated prior to the filtering.

Item ID

Lot Number

Sublot Number

Reason

Grade

State

Run Entity

Storage Entity

Quantity Produced (Min/Max)

External Reference

Production

Processed

Byproduct

Move Status

Item_Prod spare 1 to spare 4

TitleResults for “How to create a CRG?”Also Available in