Please ensure Javascript is enabled for purposes of website accessibility
Powered by Zoomin Software. For more details please contactZoomin

AVEVA™ Manufacturing Execution System

Period Layout

  • Last UpdatedNov 12, 2019
  • 1 minute read

An example of the Period layout, with tabular and chart data, is shown below.

  • The tabular Event Details section includes the following columns:

    Production Day

    Shift Name

    Item

    The produced item.

    Good

    Good production counts. Production count values are converted to the UOM of the line's standard item if one is defined.

    UOM

    Unit of measure.

    Reject

    Reject production counts. Production count values are converted to the UOM of the line's standard item if one is defined.

    UOM

    Unit of measure.

  • The Production By Item chart shows the total Good and Reject counts for the selected shifts of each day in the specified time period.

  • To see a stacked bar's value, hover the pointer over the bar.

    The MES line production report by period layout.

Related Links
TitleResults for “How to create a CRG?”Also Available in