Please ensure Javascript is enabled for purposes of website accessibility
Powered by Zoomin Software. For more details please contactZoomin

AVEVA™ Manufacturing Execution System

Labor Use Filter

  • Last UpdatedApr 24, 2017
  • 1 minute read

The available filters are listed below, with additional information about using the filter provided as needed.

User

Entity

Event Start (Begin)

If an Event Start (Begin) entry that is after the Event Start (End) entry is entered, the Event Start (End) entry is changed to match the Event Start (Begin) entry.

Event Start (End)

If an Event Start (End) entry that is before the Event Start (Begin) entry is entered, the Event Start (Begin) entry is changed to match the Event Start (End) entry.

Duration (Min/Max)

Enter a minimum or maximum event duration, or enter both to specify an inclusive range.

Labor Category

Labor Department

Shift

Shift Start (Begin)

If a Shift Start (Begin) entry that is after the Shift Start (End) entry is entered, the Shift Start (End) entry is changed to match the Shift Start (Begin) entry.

Shift Start (End)

If a Shift Start (End) entry that is before the Shift Start (Begin) entry is entered, the Shift Start (Begin) entry is changed to match the Shift Start (End) entry.

Work Order

Operation

Seq No

Step No

Item ID

Lot Number

Sublot Number

Percent To Apply (Min/Max)

Active

Comments

TitleResults for “How to create a CRG?”Also Available in