Please ensure Javascript is enabled for purposes of website accessibility
Powered by Zoomin Software. For more details please contactZoomin

AVEVA™ Manufacturing Execution System

Configuring the Automatic Determination of Bottleneck Entities

Configuring the Automatic Determination of Bottleneck Entities

  • Last UpdatedApr 17, 2026
  • 1 minute read

To ensure that the automatic determination of a line’s bottleneck entity can be performed properly, the line and the line’s entities must be configured as follows.

Note: If the production rate for an entity cannot be determined, then the line’s performance rate and bottleneck entity cannot be determined. Examples of this condition is an entity on which no job is running, there is no upstream job source for the rate, and a default rate has not been defined for the entity.

TitleResults for “How to create a CRG?”Also Available in