Maximum Duration
- Last UpdatedMar 22, 2016
- 1 minute read
When configuring a utilization reason, a Maximum Duration can be specified for a utilization reason. This value can be used to do one of the following:
-
Specify how long an entity can be in the utilization reason before the condition is considered Severe.
For example, a plant might consider an entity that is undergoing maintenance for longer than 2 hours to be in a Severe condition. If so, the Maintenance utilization reason would have its Maximum Duration set for 2 hours.
The state of the Severe flag for an entity event is shown in the Event History grid.
-
Specify how long an entity can be in the utilization reason before it is changed to a new reason. For example, you might want a machine that is in the Jammed utilization reason for more than 5 minutes to automatically switch to the Requires Mechanic Assistance reason.