Please ensure Javascript is enabled for purposes of website accessibility
Powered by Zoomin Software. For more details please contactZoomin

AVEVA™ Manufacturing Execution System

Maximum Duration

  • Last UpdatedMar 22, 2016
  • 1 minute read

When configuring a utilization reason, a Maximum Duration can be specified for a utilization reason. This value can be used to do one of the following:

  • Specify how long an entity can be in the utilization reason before the condition is considered Severe.

    For example, a plant might consider an entity that is undergoing maintenance for longer than 2 hours to be in a Severe condition. If so, the Maintenance utilization reason would have its Maximum Duration set for 2 hours.

    The state of the Severe flag for an entity event is shown in the Event History grid.

  • Specify how long an entity can be in the utilization reason before it is changed to a new reason. For example, you might want a machine that is in the Jammed utilization reason for more than 5 minutes to automatically switch to the Requires Mechanic Assistance reason.

Related Links
TitleResults for “How to create a CRG?”Also Available in