AVEVA™ Manufacturing Execution System

Import Schedule Summary

  • Last UpdatedMay 17, 2023
  • 2 minute read

When the Import Schedules node is selected in the schedule tree, the detail pane displays a summary of all defined import schedules.

Embedded Image (65% Scaling) (LIVE)

Schedule ID

The import schedule name.

Enabled

When selected, indicates that the import will be executed automatically, as determined by the selected trigger. If this check box is not selected, the import will not be executed automatically, as determined by the selected trigger.

Trigger

Displays when/how often the import will occur.

Data Type

The type of data that will be imported.

Format

The imported data’s format (delimited text, XML, or database table).

Transport

The source of the imported data (file or database).

Post Update

The action to be taken on the source file after the import has completed.

Post Action

The action to take after the import has occurred.

Last Activity

The date and time when the import last occurred.

Last Status

The completion status of the last import.

Left-clicking a column heading allows you to sort the schedule display by that field. Click that heading again to reverse the sort order. Ctrl+click on other headings to add secondary and tertiary sort fields.

The schedule data in the summary pane is display only. To modify an import schedule, select the desired import schedule node in the tree and change the desired values on the appropriate tabs.

An import schedule defines the circumstances for importing data from an outside data source into the MES database. The import schedule node is color-coded to reflect the completion status of its last import.

Embedded Image (65% Scaling) (LIVE)

  • Yellow indicates no activity, an import schedule that is ready to run or partial activity after the last execution of the import data.

  • Green indicates that the last data import was a success.

  • Red indicates a failure.

Right-clicking an import schedule opens a context menu that contains the following options:

Delete

Deletes the selected import schedule. You will be prompted to confirm the delete.

Refresh All

Updates the entire tree to reflect any changes made in this window or elsewhere.