Please ensure Javascript is enabled for purposes of website accessibility
Powered by Zoomin Software. For more details please contactZoomin

AVEVA™ Manufacturing Execution System

Specifying That the Production Lot Has Been Processed

Specifying That the Production Lot Has Been Processed

  • Last UpdatedMar 17, 2016
  • 1 minute read

You can specify that a production lot has been processed. The lot number that is used is the default lot number that has been set in the Set Lot Data dialog box (see Specifying the Default Lot Data for Production). This information is mainly used for ERP systems.

  • Click the Embedded Image (65% Scaling) (LIVE) Set Production Lot as Processed button.

Related Links
TitleResults for “How to create a CRG?”Also Available in