Specifying That the Production Lot Has Been Processed
- Last UpdatedMar 17, 2016
- 1 minute read
You can specify that a production lot has been processed. The lot number that is used is the default lot number that has been set in the Set Lot Data dialog box (see Specifying the Default Lot Data for Production). This information is mainly used for ERP systems.
-
Click the
Set Production Lot as Processed button.