Please ensure Javascript is enabled for purposes of website accessibility
Powered by Zoomin Software. For more details please contactZoomin

AVEVA™ Manufacturing Execution System

Adding Consumption of a BOM Item

  • Last UpdatedApr 25, 2017
  • 2 minute read
  1. On the BOM tab, select the BOM item record to which you want to add item consumption.

  2. Click the Embedded Image (65% Scaling) (LIVE) Add Consumption button.

    The Enter Consumption dialog box appears.

    Embedded Image (65% Scaling) (LIVE)

  3. Complete the consumption information, as described below.

    Quantity

    The quantity that was consumed.

    Consumption Code

    The reason code that indicates why the item was consumed.

    Item Desc

    Description of the item that was consumed.

    Item ID

    The unique identifier of the item that was consumed.

    Lot No

    The lot number for the item that will be consumed.

    Storage Location

    The entity at which the items to be consumed are stored.

    Expiration Date

    The calendar day that the selected lot expires.

    Work Order Id

    The work order for which the BOM item was consumed. This is verified when the consumption transaction is processed.

    Actual Qty

    Read-only. Amount previously consumed for the selected BOM item.

    Remaining Qty

    Read-only. Amount needed to meet the standard quantity scheduled for the selected BOM item.

  4. When you have finished entering the consumption information, click OK.

Related Links
TitleResults for “How to create a CRG?”Also Available in