Item Consumption Filter
- Last UpdatedApr 24, 2017
- 1 minute read

The available filters are listed below, with additional information about using the filter provided as needed.
Work Order
Operation
Seq No
Shift
Shift Start (Begin)
If a Shift Start (Begin) entry that is after the Shift Start (End) entry is entered, the Shift Start (End) entry is changed to match the Shift Start (Begin) entry.
Shift Start (End)
If a Shift Start (End) entry that is before the Shift Start (Begin) entry is entered, the Shift Start (Begin) entry is changed to match the Shift Start (End) entry.
Item ID
Lot Number
Finished Goods Lot Number
Sublot Number
Finished Goods Sublot Number
Reason
Grade
State
Run Entity
Storage Entity
Quantity Consumed (Min/Max)
User
External Reference
Scrapped
Item_Cons spare 1 to spare 4