Please ensure Javascript is enabled for purposes of website accessibility
Powered by Zoomin Software. For more details please contactZoomin

AVEVA™ Manufacturing Execution System

Assigning the Required Capabilities to the Entities in the Line

Assigning the Required Capabilities to the Entities in the Line

  • Last UpdatedMar 22, 2016
  • 1 minute read

All of the entities in the line must have the following capabilities:

  • Can Schedule Jobs

  • Can Run Jobs

  • Can Capture Utilization

  • Can Track OEE (because the entity’s default production rate is specified in its OEE settings)

See Configuring Entity Basic Information and Capabilities.

TitleResults for “How to create a CRG?”Also Available in