Adding Cross Referenced Points to the Model
- Last UpdatedJun 30, 2020
- 1 minute read
The cross-reference table has been created in the database but is not yet present in the running model. When changes are made to the cross-reference table, they must be loaded into the simulation in order for them to take effect.
-
Click the Load Cross Reference button (
) or click the Run menu, select Engineering Actions, and select Load Cross Reference.
-
Resume by clicking the Resume button (
) or click the Run menu and select Resume.