Running the Complete Model
- Last UpdatedJun 30, 2020
- 1 minute read
Now we can operate the flowsheet because the cross-reference database has been created, tied off to the model objects, and loaded into the simulation.
-
Verify that the simulation is running.

-
On the Tank Level Control flowsheet graphic, place the pump in Remote.

-
Verify the SETPOINT is 3.0.
-
Double click on VTL1 and open the valve 50%.
-
Allow the model to run until the tank level stabilizes.
-
Save a snapshot.
-
If desired, view the emulated PT2 file using TriStation.