Please ensure Javascript is enabled for purposes of website accessibility
Powered by Zoomin Software. For more details please contactZoomin

AVEVA™ Information Standards Manager

Active Standard/Change Set Actions

  • Last UpdatedApr 02, 2025
  • 3 minute read

Icon

Action

Visibility

Opens Standard/change set details

Always

Locks Standard for editing

Role-based | Standard selected | Not locked

Unlocks Standard

Locked by you | No changes

Unlocks Standard and accepts changes

Locked by you | Changes

Unlocks Standard and reject changes

Locked by you | Changes

Tags a release of active Standard

Role-based | Standard selected | Not locked

Saves changes for Standard. Changes are saved within a configured time frame. This action forces the saving of unsaved changes

Locked by you

Creates a new Standard based on active Standard/change set

Role-based

Exports active Standard/change set as file

Always

Imports from file and merges it into the active Standard

Locked by you

Run consistency validation

Locked by you

Clear consistency validation result

Consistency validation has been executed, with issues detected.

Clear all content from the active Class Library

Locked by you

Closes active Standard/change set

Always

Imports a Class Library from file. This creates a temporary Standard. Save it as a new Standard, if required.

Always

Creates a new, empty Standard

Role-based

Related Links
TitleResults for “How to create a CRG?”Also Available in