Please ensure Javascript is enabled for purposes of website accessibility
Powered by Zoomin Software. For more details please contactZoomin

AVEVA™ Engineering

Totalling

  • Last UpdatedMar 15, 2023
  • 1 minute read

To see the effect of totalling, use the template centre_line.tmp and set the hierarchy to 100-B-1 and 100-B-2.

The template as supplied will report on the Branches, giving the Pipe name and the Pipe Specification, sorted on descending order of Head Bore, and the Centre Line Length, as follows:

Centre Line Length Report for /100-B-1 /100-B-2

PIPE NAME PSPEC HEAD BORE CENTRE LINE

LENGTH

/100-B-2 /100-B-2-B1 /A3B 100.00 7610.35

/100-B-1 /100-B-1-B2 /A3B 80.00 2455.19

/100-B-2 /100-B-2-B2 /A3B 80.00 2526.65

/100-B-1 /100-B-1-B1 /A3B 50.00 39524.56

/100-B-1 /100-B-1-B3 /A3B 50.00 3119.80

Now switch on the Totalling option button on the Layout for Column form for the Centre Line Length column, and the report will appear like this:

Centre Line Length Report for /100-B-1 /100-B-2

PIPE NAME PSPEC HEAD BORE CENTRE LINE

LENGTH

/100-B-2 /100-B-2-B1 /A3B 100.00 7610.35

/100-B-1 /100-B-1-B2 /A3B 80.00 2455.19

/100-B-2 /100-B-2-B2 /A3B 80.00 2526.65

/100-B-1 /100-B-1-B1 /A3B 50.00 39524.56

/100-B-1 /100-B-1-B3 /A3B 50.00 3119.80

===========

55236.56

TitleResults for “How to create a CRG?”Also Available in