Please ensure Javascript is enabled for purposes of website accessibility
Powered by Zoomin Software. For more details please contactZoomin

AVEVA™ Batch Management

Configure ManAdd formula parameter

  • Last UpdatedAug 04, 2026
  • 1 minute read
  1. In the Edit Phases dialog box, select the ManAdd phase.

  2. Select Formula Parameters.

  3. In the Formula Parameters dialog box, select the Qty parameter.

  4. In the Elements section, select the Target, Actual, Lot Code, and Material ID check boxes.

  5. In the Enable Display column, select the check boxes for Target, Actual, Lot Code, and Material ID.

  6. In the Edit Allowed column, select the check boxes for Actual and Lot Code.

  7. In the Edit Required column, select the check boxes for Actual and Lot Code.

  8. Select Apply.

    Note: You do not need to create tags for the ManAdd phase.

The following image shows completed instructions for the Qty parameter.

Related Links