Please ensure Javascript is enabled for purposes of website accessibility
Powered by Zoomin Software. For more details please contactZoomin

AVEVA™ Batch Management

Check Unit Procedure Validity

  • Last UpdatedOct 29, 2024
  • 1 minute read

When you attempt to load a unit procedure into a recipe procedure, the following checks are performed to ensure the validity of the unit procedure.

  • The process class assigned to the unit procedure must exist in the Equipment Requirements Editor. If the class does not exist, an error message appears and the load fails.

  • If the process class exists, the process instance is automatically added to the recipe equipment requirements. You must acknowledge the message for each instance.

  • Materials included in the unit procedure definition can optionally be added to the recipe formula. You must acknowledge the message for each material.

    Note: Remember that adding unit procedures from the library may result in the addition of process and transfer instances to the recipe equipment requirements. You must ensure that the recipe equipment requirement has only the required instances defined. When the recipe is scheduled as a batch, the train must have equipment for each instance, regardless of whether the instance is called in the procedure. If not, you cannot initialize the batch.

TitleResults for “How to create a CRG?”Also Available in