Please ensure Javascript is enabled for purposes of website accessibility
Powered by Zoomin Software. For more details please contactZoomin

AVEVA™ Batch Management

BatchList

  • Last UpdatedJun 06, 2017
  • 1 minute read

The BatchList control provides live list data. You can configure the BatchList control to be a schedule list, active batch list, active phase list, or parameter list. You can configure any list found on Batch or Batch Scheduler with the BatchList control.

You can configure the BatchList to be any of the following:

BatchView

BatchView has the following components:

  • Batch (Active Batch List)

  • Message List

  • Question List

  • Transition:

    • Transition List

    • Tag List

  • Allocation Queue List

  • Phase Edit:

    • Phase List

    • Parameter List

  • Equipment Allocation:

    • Equipment

    • Instance

  • Select Equipment:

    • Instance

    • Equipment

  • Phase List (Active Phases)

  • Parameter List

  • Interlock List

ScheduleEdit

ScheduleEdit has the following components:

  • Schedule List

  • Train List

  • Recipe List

  • Formula List

  • Error List

TitleResults for “How to create a CRG?”Also Available in