Add Batch Button Controls
- Last UpdatedOct 29, 2024
- 1 minute read
To manipulate the schedule list, you can add BatchButton controls to the window.
To add BatchButton controls
-
Drop a BatchButton control onto the window at the lower left.
-
Double-click the control to open the Property page.
-
Select the Batch Button tab.
-
Open the Schedule Edit node of the tree view.
The Schedule list appears as a folder.
-
Open the Schedule list.
-
Click Add and then click Apply.

-
Copy this control seven (7) more times and configure the copies as the Delete, Change, CleanUp, Initialize Batch, Initialize All, Move Up, and Move Down buttons as shown.

You are now ready to test the scheduler.