Validate the Process Model
- Last UpdatedOct 29, 2024
- 1 minute read
Use the File > Validate menu to initiate a validation of the Process Model database. Validation consists of a verification of the following elements:
-
All automatic phases have tag assignments for (minimally) the Start, Reset, Ready, and Done phase control and status bits.
-
All semi-automatic phases have tag assignments for (minimally) the Start, Reset, Ready, and Done phase control and status bits.
-
All tags assigned to an Edit Allowed or Edit Required actual element of a formula parameter must have a read/write access mode.
-
At least one equipment status has been defined.
-
One of the defined equipment statuses has been assigned as the default status.
To validate the process model
-
From the File menu on the Process Model Editor dialog box, click Validate.
If the validation is successful, the Validation dialog box indicates that the process model configuration is valid. If validation errors exist, the associated phases and tags are shown along with a validation error message. You can use the information to troubleshoot the process model configuration.
-
Click Close.