Please ensure Javascript is enabled for purposes of website accessibility
Powered by Zoomin Software. For more details please contactZoomin

AVEVA™ Batch Management

Define Lot Tracking Information

  • Last UpdatedOct 29, 2024
  • 1 minute read

You can enter lot tracking information for each unit assigned to a material.

Note: The Materials Editor does not require you to define lot tracking information for all materials used in production. The AVEVA Batch Management System records the lot tracking information to the History database if this information is defined, but if the information is not defined, the AVEVA Batch Management System still processes all batches that use the material.

To assign lot tracking information

  1. Open the Materials Status dialog box.

  2. Select a material ID.

  3. On the Edit menu, click Material Locations.

    The Material Location Assignment Editor dialog box appears.

  4. In the Unit Assignment list, click a unit.

  5. In the Campaign, Lot, and Batch boxes, type the required information. The Batch box is limited to a 16 character maximum. You must specify at least one of these items.

  6. In the Date Rcvd list and Quantity box, click and type the required information.

  7. Click Add.

To assign an actual value to a unit assignment

  1. Open the Materials Status dialog box.

  2. Select a material ID.

  3. On the Edit menu, click Material Locations.

    The Material Location Assignment Editor dialog box appears.

  4. In the Unit Assignment list, click a unit.

    If the selected unit does not have a defined characteristic, you cannot enter an Actual Value.

  5. In the Actual Value box, type a value for the characteristic.

  6. Click Change.

    TitleResults for “How to create a CRG?”Also Available in