Please ensure Javascript is enabled for purposes of website accessibility
Powered by Zoomin Software. For more details please contactZoomin

AVEVA™ Batch Management

Control Batches

  • Last UpdatedOct 29, 2024
  • 1 minute read

Batches that are initialized have a status of Ready. If a batch is Ready, you can select it from the Schedules dialog box and start it with the Batch Start button. Batches that are running have a status of Run. If a batch has a status of Run, the batch can be put in Held status. If a batch has a status of Held, the batch can be Restarted or Aborted.

Batch Status

Description

Active Buttons

Ready

The batch is ready to be Started.

Batch Start

Run

The batch is running. The batch can be put in Hold status.

Batch Hold

Held

The batch is in Hold status. The batch can be Re-started or Aborted.

Batch Restart
Batch Abort

Aborting

The batch is being aborted.

N/A

Aborted

The batch was aborted.

N/A

Done

The batch is finished.

N/A

Locking

The batch is aborting phases to enter into Jump mode.

N/A

Locked

The batch is locked and in Jump mode.

N/A

TitleResults for “How to create a CRG?”Also Available in