Please ensure Javascript is enabled for purposes of website accessibility
Powered by Zoomin Software. For more details please contactZoomin

AVEVA™ Batch Management

Control Buttons

  • Last UpdatedJun 06, 2017
  • 1 minute read

Operators use control buttons to initiate or alter process actions during phase processing. Control buttons are included in user interfaces for batch processing displays. Each phase has two available control buttons. Control buttons are associated with the values of discrete tags.

A summary of all phase parameters is shown in the following table.

Parameter

Type

Elements

Formula

Input

Target
Actual
High Deviation (%)
Low Deviation (%)
Lot Code
Preact
Lot Code
Material Id

Process Variable

Target
Actual
High Deviation (%)
Low Deviation (%)
High Limit
Low Limit

Output

Target
Actual
Material Id

Phase Control

Start
Hold
Restart
Abort
Reset

Phase Status

Ready
Run
Held
Done
Aborted
Interlocked

Interlocks

Application Specific

Control Buttons

Button #1
Button #2

Related Links
TitleResults for “How to create a CRG?”Also Available in