Cut and Copy Procedure Objects
- Last UpdatedOct 29, 2024
- 1 minute read
You can cut objects from the respective procedure sequence and paste objects into another procedure sequence.
Note: When you cut or copy a branch, ensure that you properly select the appropriate leg. When you cut or copy a loop, ensure that you properly select the transition object or exit point of the loop. Otherwise you may not achieve the intended result.
To cut or copy a procedure object
-
Click the procedure object that you want to cut or copy.
-
Click the Cut or Copy icon.
To cut or copy a loop including its procedure object
-
Click the transition object (lower portion) of the loop that you want to cut or copy.
-
Click the Cut or Copy icon.
The loop itself, including all transition logic, and any other objects within the loop are included.
To cut or copy a loop without its procedure object
-
Click the entry point of the loop (denoted by arrowhead) that you want to cut or copy.
-
Click the Cut or Copy icon.
Only the loop (including the transition object and any associated transition logic) is copied. If you performed a cut operation, the object that was previously associated with the loop remains in the procedure but no longer has transition logic associated with it.
To cut or copy a branch
-
Click the top of the leg of the branch that you want to cut or copy.
-
Click the Cut or Copy icon.
All the procedure objects, loops, transition logic and other branches that are in the selected leg are included.