Please ensure Javascript is enabled for purposes of website accessibility
Powered by Zoomin Software. For more details please contactZoomin

AVEVA™ Batch Management

Define Transfer Phases

  • Last UpdatedOct 25, 2024
  • 1 minute read

Each transfer class should have at least one transfer phase defined. The phase is responsible for moving material from a source unit to a destination unit.

To define transfer phases

  1. With the Transfers tab active, select the Bulk_Mix transfer class.

  2. Click Phases.

    The Edit Phases dialog box appears.

  3. In the Name box, type BulkAdd.

  4. Accept the Automatic Phase Type.

  5. In the Save History area, select the Control/Status Activity and Parameter Status check boxes.

    If you do not select these check boxes, phase events and parameters are not stored in the history database.

  6. Click Add.

  7. Repeat steps 2 through 6 for the Mix_Hold transfer phase, but type Transfer in the Name box.

  8. Click Close.

    Note: You must click the Change button following any phase modifications.

TitleResults for “How to create a CRG?”Also Available in