Please ensure Javascript is enabled for purposes of website accessibility
Powered by Zoomin Software. For more details please contactZoomin

AVEVA™ Batch Management

Control the Status of a Phase

  • Last UpdatedOct 29, 2024
  • 1 minute read

You can use the phase control buttons to control the status of a phase. All active phases and their current statuses are shown in the Phase List. Any phase that requires operator action is shown with double asterisks (**) in the Action column. You can select any active phase to view its parameters, instructions, and interlocks. If the phase has been properly configured in the process model, you can hold, restart, or abort the phase. The following table lists the various phase statuses and an explanation of their operation.

Phase Status

Description

Action

Wait

The phase is waiting for operator action.
The message line indicates whether a comment or an acknowledgement is required.

Acknowledge or edit the comment.

Wait

The phase is currently running. You can run the phase after acknowledging the message. Batch Manager waits until the phase is Ready.

Acknowledge the Unexpected Status dialog box.

Run

The phase is running.

Phase Hold

Held

The phase is in the Hold status. You can restart or abort the phase.

Phase Restart or Phase Abort

Done

Phase processing is complete.

N/A

Interlocked

Interlocks are preventing the phase from running.

Select the Interlocks button.

Aborted

The phase has been Aborted.

N/A

To control the status of a phase

  1. Open the Batch Display dialog box.

  2. In the Phase List area, select an active phase.

  3. Click one of the following phase control buttons:

    • Phase Hold

    • Phase Restart

    • Phase Abort

TitleResults for “How to create a CRG?”Also Available in