Configure a PI Data Archive connection
- Last UpdatedNov 22, 2022
- 1 minute read
- PI System
- PI Manual Logger 2017 R2
- Visualization
You need to configure a connection to the PI Data Archive where PI Manual Logger tour run data will be sent after a tour run is complete and approved.
-
The PI Manual Logger Windows database must connect to a single PI Data Archive only.
-
Ensure that all PI Manual Logger users are logged off if you need to change the target PI Data Archive for a PI Manual Logger database.
-
In PI Manual Logger, select Tools > PI Data Archive Setup.
-
In the PI Data Archive Setup window, click Advanced.
-
In the PI Connection Manager window, select the PI Data Archive to which you want to connect.
-
Click Save.