Please ensure Javascript is enabled for purposes of website accessibility
Powered by Zoomin Software. For more details please contactZoomin

AVEVA™ Model Driven MES 7​.0

Job specification grid

  • Last UpdatedOct 08, 2025
  • 1 minute read

The job specifications for the work order selected on the WO/PO tab are displayed in this grid. The grid includes standard controls for sorting and filtering the records by columns and for navigating to other pages of the grid.

Operation: The operation to which the specification was assigned.

Sequence Number: The sequence number for the job within the operation.

Spec ID: The unique identifier for the specification.

Target: The target value for the specification setting.

Spec Description: A description of the specification.

Spec Group: The specification group to which the specification belongs.

Units: The unit of measure for the specification setting values.

TitleResults for “How to create a CRG?”Also Available in