How job BOM quantities are calculated
- Last UpdatedOct 08, 2025
- 1 minute read
The job BOM record Details panel includes the minimum quantity, the quantity, and the maximum quantity for the item to be consumed or produced in that job BOM per unit of the produced item. These quantities are calculated as follows.
If the job BOM record is for a consumed item and the consumption quantities of the consumed item do not depend on the number of produced parent items (that is, the BOM item is configured as a constant quantity), then this quantity will be equal to the quantity per parent item.
For all other job BOM records, it will be one of the following, whichever value is greater:
-
The start quantity multiplied by the minimum quantity/quantity/maximum quantity per parent item.
-
The sum of the produced quantity plus the rejected quantity multiplied by the minimum quantity/quantity/maximum quantity per parent item.