Execute Performance Management use case details
- Last UpdatedOct 15, 2025
- 2 minute read
Execute a Performance Management use case detail in the use case details area. The use case details are lounged from panel buttons. What use case detail is lounged from a panel button depends on the link configuration in the composable engine. The link itself can be dependent on configured context.
The following topics describe the default configuration of the use case detail links which all reference to the module components of the Performance Management module. Module components are basic use case details provided with the modules.
Select from the following Performance Management panel buttons depending on the current utilization status. Selecting a button opens use case details related to the performance management item.
Refresh |
|
|
|
Use the Refresh panel button to reload the utilization event list and use case details area. For detailed information on executing the Refresh use case details, see Refresh the utilization event list. |
Assign Utilization Event Reason |
|
|
|
Use the Assign Utilization Event Reason panel button to assign utilization reason groups and reasons to the selected event. For detailed information on executing the use case details, see Assign a utilization event reason. |
Merge Utilization Event |
|
|
|
Use the Merge Utilization Event panel button to (depending on the MES configuration) either update the selected event utilization reason to match the utilization reason of an adjacent event, or merge two adjacent events into a single event. For detailed information on executing the use case details, see Merge utilization events. |
Split Utilization Event |
|
|
|
Use the Split Utilization Event panel button to split the selected event into two events. Any event type can be split. For detailed information on executing the use case details, see Split a utilization event |



