Split a utilization event

  • Last UpdatedOct 15, 2025
  • 2 minute read

Use the Split Utilization Event use case details to split a utilization event into two separate events. Specify event durations for each new event.

The Split Utilization Event use case details.

Split a utilization event

For the selected utilization event:

  1. Select the Split Utilization Event panel button.

  2. Review the Event Time to verify the event start date and time.

  3. To split the event, do one of the following:

    • To split the event left, select Split Left.

    • To split the event right, select Split Right.

  4. Drag the Split Slider to a location that reflects the correct duration of each of the split events.

    The First Part and Second Part intervals update to show the durations of the split events.

  5. Enter a Comment to provide additional context about the update.

  6. Select Split.

    The Equipment Utilization Event list and status bar are updated immediately with the new events.

    Note: The new events retain the formerly assigned utilization reasons. Select each event to assign new utilization reasons to the new events. For detailed instructions, see Assign a utilization event reason.