Please ensure Javascript is enabled for purposes of website accessibility
Powered by Zoomin Software. For more details please contactZoomin

AVEVA™ Instrumentation

Hookup Reports

  • Last UpdatedOct 15, 2025
  • 2 minute read

The following reports related to Hook-ups are available in Designer:

  • BOM/Material Take Off

  • Tags Assigned

  • Tags not yet Assigned

These are accessed from the Reports grid.

The BOM/Material Take Off report lists the Hook-up items that comprise the project Bill of Materials.

The report is displayed in the Hookup Bill of Materials window:

An item is added to the BOM by assigning it to a Hookup drawing and unchecking its No. checkbox (see Assign Tags to a Hookup).

The Tags Assigned report lists the tags assigned to Hookup drawings in the project:

The Tags not yet Assigned report lists the tags not yet assigned to Hookup drawings in the project:

Only those tags that are pre-assigned via Hookup type (template) are listed.

For descriptions of the toolbar buttons of the Tags Assigned and Tags not yet Assigned report window, refer to Reports.

Related Links
TitleResults for “How to create a CRG?”Also Available in