Please ensure Javascript is enabled for purposes of website accessibility
Powered by Zoomin Software. For more details please contactZoomin

AVEVA™ Instrumentation

Cable Schedule

  • Last UpdatedOct 31, 2025
  • 1 minute read

The Cable Schedule is used to add/edit and view all project cables and allows definition of cable type from the Cable Catalog. Users may also edit specific cable data such as Cable Number, Length and assign From and To equipment .

In AVEVA Instrumentation, all project cables must be based on a catalog cable. This ensures the project cable properties (size, number of cores, type .) are consistent with a 'real' cable. You can reassign another catalog cable to any project cable at any time. This changes the project cable to have the properties (size, number of cores, core markings, type .) of the newly assigned catalog cable, keeping current terminations for the original cable.

  1. To open the Cable Schedule, click Select in the Grids and Schedules section of the Home tab.

  2. Select Cable Schedule from the list of grids that is then displayed.

    The Cable Schedule grid is then displayed:

    By default all cables for the project are shown in the grid. You may use the Filter by Area list in the List Tools tab to filter the Cable Schedule by plant area.

    All fields except those with a yellow background can be edited directly within the grid.

    For further information on grid functionality, refer to Working with the Data Grid.

TitleResults for “How to create a CRG?”Also Available in