Create Tag Wiring using Wiring Rules

  • Last UpdatedOct 30, 2025
  • 3 minute read

In the Add New Tag or Edit window for the instrument (see General Tab in Add and Edit Tag Windows), open the Detail tab and click on the Create Tag Wiring button.

The following window is then displayed:

Explanation of fields:

Tag No

The instrument tag number, non-editable.

Note: Although the specified Wiring Rule (in the Wiring Config field) defines the terminal configurations of a Field Device, Users can select a different configurations clicking on the button in the Tag No field and selecting from the list of configurations in the Select a Field Device Terminal Configuration window that is then displayed. See Select a Field Device Terminal Configuration.

Loop Dwg Code

The 'Loop Code' is used by AVEVA Instrumentation Datalinks to map information into a loop drawing template when generating CAD drawings. It is ONLY required if CAD loop drawings are to be generated in Instrumentation Designer. This 'Loop Code' must be unique for the current loop for CAD loop drawing creation.

Wiring Config

The name of the Wiring Rule to apply to the tag. Select the rule by clicking the button in the field. The Wiring Rule Definitions window is then displayed (refer to Assign Wiring Rules to Tags for details). Select the required rule from the list of rules and click OK. The selected rule is then displayed in this field.

Junction Box

This displays the name of the equipment the cable will run to. Clicking on the button in this field will display a window used to Assign a Junction Box.

Terminate

When this checkbox is checked, cores will be terminated at the Junction Box end (on the next available spare terminals). When it is unchecked, cores will not be terminated at the Junction Box end. The cores will need to be terminated manually, using Instrument Wiring Manager, by dragging the cable or cores to the desired terminals.

Cable Number

This shows the default cable number as created by the wiring rule or the actual cable number from the Instrument Wiring Manager Cable Schedule (if the cable has been created previously). Enter a new value if required.

Cable Type

This shows the base cable type. It can be changed by selecting the cell command button that appears when the mouse is hovered over this cell. The initial cable type comes from the Wiring Rule Catalog cable (if the cable is not yet created) or from the Cable Schedule (if the cable has been created previously). Clicking the cell button displays the Select a Cable from Catalog window allowing a new Catalog cable to be selected.

Note:
The core sequences of Wiring Rules override those of Catalog cables. The connection order of a Wiring Rule is always preserved even if this does not match the core sequence order defined in the Cable Catalog.

Cable Length

Enter a Cable Length here. This length is saved in Instrument Wiring Manager's Cable Schedule.

Command Buttons:

Create

Creates all selected tags, cables, termination and other wiring data from the Wiring Rules and data in this grid.

Save

Saves the changed data in the grid, but does not create Wiring Rule data. This enables Users to pre-assign junction boxes etc. prior to cable/device creation.

Cancel

Exits the window, not saving or creating wiring.

As soon the wiring data is created, all the information generated (or changed) may be viewed in the Tag Wiring Check Report. For further information, refer to Tag Wiring Check Reports.