Please ensure Javascript is enabled for purposes of website accessibility
Powered by Zoomin Software. For more details please contactZoomin

AVEVA™ Instrumentation

Terminate Cables

  • Last UpdatedNov 07, 2025
  • 1 minute read
  1. To terminate cable cores (wires in cable) to a Terminal, right-click on the cable (near the end required to connect).

    This displays the following menu (in this example the 'from' or left end was selected).

  2. Select Connect Wire (From).

    A sub-menu with a list of all cores not yet terminated is displayed. For example:

  3. To terminate a Core, click on the core marking then click on the Terminal required to be terminated on.

    Note: The core sequences of Wiring Rules override those of catalog cables. The connection order of a Wiring Rule is always preserved even if this does not match the core sequence order defined in the Cable Catalog.

TitleResults for “How to create a CRG?”Also Available in