Please ensure Javascript is enabled for purposes of website accessibility
Powered by Zoomin Software. For more details please contactZoomin

AVEVA™ Instrumentation

Assign a Junction Box

  • Last UpdatedNov 05, 2025
  • 2 minute read

When selecting a Junction Box when applying Wiring Rules, the following Assign <Tag Number> to... window is displayed, initially listing all junction boxes defined in the current plant area:

  1. Select the All Areas option to view equipment in all plant areas.

  2. To assign a Junction Box, double-click on the required equipment tag.

    Junction Boxes and other Equipment (other than field devices) can only be created in the Instrument Wiring Manager module.

    Notes: In order to select another Tag as the Junction Box (cable end) connection that tag must have previously been created by a Wiring Rule for it to appear in the List of Equipment. For example, to connect a Field Element to a Transmitter, first the Transmitter must be created, then the element must be assigned to the Transmitter (e.g the Transmitter becomes the element's Junction Box).

    The instrument Signal Type is shown near the top of this window. This comes from the Instrument's Signal Type field in the Instrument Data window. However any instrument may be assigned to any junction box, regardless of signal type.

    The maximum number of cables that may be connected to a junction box may (optionally) be specified in Instrument Wiring Manager. If the application of a wiring rule would result in more than when the maximum number of cables being assigned to it, a message is displayed to inform you of this.

TitleResults for “How to create a CRG?”Also Available in