Please ensure Javascript is enabled for purposes of website accessibility
Powered by Zoomin Software. For more details please contactZoomin

AVEVA™ Simulation for Foxboro Control

Checkpointing CPs in IACC

  • Last UpdatedApr 20, 2020
  • 1 minute read

First, verify that the compounds are turned on, the blocks are valid, and the simulation has run through a complete cycle to verify each block has processed at least once. Freeze the simulation before performing a checkpoint operation.

  1. Within the IACC, click the Network pane, expand the tree, and navigate to a CP.

  2. Right-click the CP, select Validate/Download, and then click Checkpoint.

Related Links
TitleResults for “How to create a CRG?”Also Available in