Please ensure Javascript is enabled for purposes of website accessibility
Powered by Zoomin Software. For more details please contactZoomin

AVEVA™ Point Cloud Manager

Point Cloud Manager Desktop 25​.3​.0 release notes

Point Cloud Manager Desktop 25​.3​.0 release notes

  • Last UpdatedAug 06, 2026
  • 2 minute read

The Point Cloud Manager v25.3.0 release includes the following new features and enhancements, resolved issues, and known issues.

New features and enhancements

  • Faster cloud project loading: The change has been made to reduce the amount of information required when initially accessing the project. This means that projects will open quicker. To combat this, the loading of some resources have been moved to loading of individual datasets. This means a large project can be opened quicker and individual datasets may load slightly slower, depending on size.

  • Asset entity browser support: This enhancement introduces a dedicated Asset Browser panel on the right-hand side of the interface, providing a hierarchical view of an asset library. Projects that have been classified through the admin panel on CONNECT can be intelligently linked to entities within the Asset Entity browser.

  • Proxy support for clashing and demolition: Point Cloud Manager Desktop now supports clashing and demolition operations for cloud projects accessed through networks with proxy server configurations, enabling broader compatibility across enterprise environments.

  • Improved measurement performance in cloud projects: We have significantly enhanced measurement responsiveness in cloud projects. Users will now experience faster feedback when performing measurements.

  • Trimble E57 containing sky: E57 files processed in Trimble RealWorks™ from Trimble scanners will now display sky data within BubbleViews in Point Cloud Manager Desktop. This visual enhancement will also be available in Point Cloud Manager on CONNECT in the upcoming releases.

  • Floorplan upload role change: To simplify CONNECT project setup, uploading floorplans to CONNECT projects no longer requires the Administrator role.

  • Supported third-party CAD systems: Included support for the following CAD systems.

    CAD system

    Release supported

    Autodesk

    Revit 2024, 2025, 2026

    AutoCAD 2026

    Navisworks 2026

Resolved issues

Internal reference

Description

3987293

Uploading large E57 files using the "Upload" utility was previously failing. This has now been fixed, and larger E57 files are supported.

4036875

Disabling of coordinate systems for cloud projects is inconsistent and has been made the same as local projects.

4077797

Improved the time taken for cloud projects to load within Point Cloud Manager Desktop.

3965721

Projects downloaded from CONNECT now include associated objects.

Known issues

Internal reference

Description

4103014

Sky is not present in E57 files generated from FARO scanners and processed in FARO scene.

4268128

Downloaded projects do not support demolished points in BubbleViews.